Tag

#MoonToMars

Browsing

The Moon Outpost Challenge: Who Will Be First to Build on the Moon?

The race to build a lunar outpost is heating up between NASA’s Artemis Program and China’s International Lunar Research Station (ILRS). Each aims to establish a long-term presence on the Moon’s south pole, marking a new chapter in lunar exploration and development. With significant technological and logistical challenges, the timeline for each initiative remains uncertain

Summary

  • NASA’s Artemis Program aims to establish a permanent lunar base near the Moon’s south pole by 2028.
  • Artemis II, scheduled for April 2026, will be the first crewed circumlunar flight since Apollo.
  • The Lunar Gateway, a collaborative international station, will support NASA’s lunar exploration goals.
  • China, in partnership with Russia, is developing the International Lunar Research Station (ILRS).
  • The ILRS aims to establish a Moon base in the South Pole-Aitken Basin by 2030.
  • Delays with the Artemis Program, especially the Space Launch System (SLS) and Orion spacecraft, have raised concerns about meeting schedules.
  • China’s rapid progress in space exploration, including the Chang’e missions, strengthens its chances in the lunar race.
  • NASA’s Artemis Base Camp includes advanced vehicles, habitats, and mobility systems for long-term missions.
  • China’s ILRS architecture involves multiple lunar facilities, including a command center and research hubs.
  • Both NASA and China are investing in in-situ resource utilization (ISRU) for sustainable Moon operations.
  • The lunar south pole is the primary target due to its abundant water ice reserves.
  • Political and economic factors heavily influence the pace and success of lunar exploration missions.
  • SpaceX’s Starship plays a crucial role in NASA’s Human Landing System (HLS) but faces development delays.
  • Technological breakthroughs in 3D printing and ISRU are critical to building Moon bases.
  • The Moon base race has significant implications for international partnerships and the future of space exploration.

Back to the Moon to Stay

NASA’s journey back to the Moon began with the passage of the NASA Authorization Act of 2005. This act not only funded robotic exploration programs but also emphasized the need for a permanent human presence on the Moon as a stepping stone for future missions to Mars.

Initially, NASA’s plans were guided by the Constellation Program, which aimed to return astronauts to the Moon by the 2020s. However, economic challenges, including the 2008 financial crisis, delayed progress. By 2010, the program evolved into the Moon to Mars architecture, focusing on developing the Space Launch System (SLS) and Orion spacecraft.

The Moon Outpost Challenge Who Will Be First to Build on the Moon (7)
It is possible to build a Moon base using 3D printing. This process is called ISRU, or In-Situ Resource Utilization. In-Situ Resource Utilization means using materials found on the Moon to build things. This illustration shows how it could be done. Credit for the illustration goes to RegoLight. The visualization was created by Liquifer Systems Group in 2018.

In 2017, NASA announced the Artemis Program, named after Apollo’s twin sister in Greek mythology. This ambitious plan aims to conduct sustainable lunar exploration and development, with the ultimate goal of establishing a permanent lunar base near the Moon’s south pole.

Despite significant progress, the Artemis Program has faced delays. Artemis I successfully launched in November 2022, but Artemis II and Artemis III have been postponed to April 2026 and mid-2027, respectively. You can learn more about the Artemis Program on NASA’s official website.

The Moon Outpost Challenge Who Will Be First to Build on the Moon
The workers moved the first Long March 5 rocket for launch. This happened at the Wenchang Space Launch Center. They did this in late October 2016. Su Dong from China Daily captured this moment in a photograph.

The Lunar Gateway and Artemis Base Camp

NASA’s Lunar Gateway is central to its plans for a sustainable lunar presence. This space station, positioned in a near-rectilinear halo orbit around the Moon, will act as a hub for crewed and robotic missions. The Gateway is being developed in partnership with the European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA), Canadian Space Agency (CSA), and other international partners.

Key modules include:

  • Power and Propulsion Element (PPE)
  • Habitation and Logistics Outpost (HALO)
  • European System Providing Refueling, Infrastructure, and Telecommunications (ESPRIT)
  • Canadarm3 robotic arm

The Lunar Gateway will serve as a staging point for landing missions and scientific research. Learn more about its architecture on NASA’s Lunar Gateway page.

The Artemis Base Camp is NASA’s proposed lunar surface habitat. It includes three core elements:

  • Lunar Terrain Vehicle (LTV): A mobility system for exploring the lunar surface.
  • Habitable Mobility Platform (HMP): A pressurized rover supporting 45-day missions.
  • Foundation Surface Habitat (FSH): A base for short-term stays.
The Moon Outpost Challenge Who Will Be First to Build on the Moon
Illustration of concept

Table 1: Core Components of Artemis Base Camp

Component Description Function
Lunar Terrain Vehicle Unpressurized rover Short-range exploration
Habitable Mobility Platform Pressurized rover Long-range missions
Foundation Surface Habitat Lunar base for 4 crew members Short-term habitation

China and Russia’s ILRS

In response to NASA’s Artemis Program, China and Russia announced the International Lunar Research Station (ILRS) in 2021. The ILRS aims to establish a Moon base in the South Pole-Aitken Basin by 2030. The CNSA and Roscosmos have invited international partners to join the project, outlined in the ILRS Guide for Partnership.

The ILRS consists of five primary facilities:

  • Cislunar Transportation Facility (CLF): An orbital station like the Lunar Gateway.
  • Telemetry, Tracking, and Command (TT&C): Communication and energy infrastructure.
  • Lunar Transportation and Operation Facility (LTOF): Vehicle storage and maintenance hub.
  • Lunar Scientific Facility: Research modules for geology, physics, and ISRU.
  • Ground Support and Application Facility (GSAF): Data processing and operational support.
The Moon Outpost Challenge Who Will Be First to Build on the Moon
This image shows an artist’s vision of the Ares I and V rockets. NASA and the Marshall Space Flight Center are responsible for this illustration.

Table 2: Phases of ILRS Development

Phase Timeline Objectives
Reconnaissance 2021–2025 Site scouting, sample return
Construction 2025–2030 Build command center, ISRU trials
Utilization 2030–2035 Complete base and begin operations

Challenges and Delays

Both NASA and China face significant challenges in the lunar race.

NASA’s SLS and Orion spacecraft have experienced cost overruns and technical setbacks. The SLS’s first flight was delayed for six years, and Orion’s next test flight (Artemis II) will occur nearly a decade after its maiden voyage.

China has advanced rapidly with its Chang’e missions, successfully landing rovers on the Moon and returning samples. However, building a permanent base requires breakthroughs in in-situ resource utilization (ISRU) and 3D printing.

The Moon Outpost Challenge Who Will Be First to Build on the Moon (5)
Orion is NASA’s spaceship. It explores deep space. Orion will carry astronauts from Earth to the Moon. It will also bring them safely back home. Credit: Lockheed Martin

The Lunar South Pole: The Ultimate Prize

The Moon’s south pole is the focus of both programs due to its abundant water ice deposits, essential for producing oxygen, drinking water, and rocket fuel. The region’s unique lighting conditions also allow for continuous solar power generation.

Facts About Lunar Exploration

  • The Moon has an average surface temperature ranging from -173°C at night to 127°C during the day.
  • Water ice on the Moon is believed to be billions of years old.
  • The Moon’s gravity is only 1/6th that of Earth, making it easier to move heavy equipment.
  • NASA’s Apollo missions brought back 382 kilograms of lunar samples.
  • China’s Chang’e 5 mission retrieved over 1.7 kilograms of samples in 2020.

The Role of SpaceX

SpaceX’s Starship is a critical component of NASA’s Human Landing System (HLS). The fully reusable spacecraft will ferry astronauts between the Lunar Gateway and the Moon’s surface. However, Starship’s development has faced delays, including its first orbital test flight, which occurred in mid-2024.

Learn more about SpaceX’s contributions to the Artemis Program on their official website.

The race to build a Moon base is about more than scientific exploration. It represents a strategic competition for technological leadership and international influence. As NASA and China push ahead with their respective programs, the outcome will shape the future of space exploration and humanity’s first steps toward becoming an interplanetary species.

The Moon Outpost Challenge Who Will Be First to Build on the Moon
Illustration of the ILRS project from a guide by CNSA released in June 2021. Credit goes to CNSA.

References

  1. NASA’s Artemis Program
  2. European Space Agency – Lunar Gateway
  3. China National Space Administration – ILRS Guide
  4. SpaceX – Starship Overview
  5. South Pole-Aitken Basin Details
#MoonRace, #ArtemisProgram, #LunarGateway, #ChinaILRS, #SpaceExploration, #MoonBase, #LunarSouthPole, #NASA, #SpaceX, #BlueOrigin, #CNSA, #MoonResources, #LunarScience, #MoonToMars, #FutureOfSpace, #SpaceRace

Artemis Program: Why a Moon Base Will Need a Transport System

Key Takeaway

The Artemis Program aims to establish a permanent human presence on the Moon, necessitating advanced transport systems to move astronauts and cargo efficiently. Addressing logistical, scientific, and technical requirements, these transport systems will play a crucial role in ensuring the success of lunar missions and the sustainability of human activities on the Moon.

Summary

  • NASA’s Artemis Program will return astronauts to the Moon for the first time since 1972.
  • The program aims to establish a permanent human presence on the Moon.
  • Transport systems are essential for moving astronauts and cargo on the lunar surface.
  • The 2024 Moon to Mars Architecture white paper highlights the need for lunar mobility systems.
  • NASA’s objectives include the delivery of crews, supplies, experiments, and habitats.
  • The Lunar Terrain Vehicle (LTV) and Pressurized Rover (PR) are part of the Artemis Base Camp.
  • The Artemis Program is divided into three segments: Human Lunar Return (HLR), Foundational Exploration (FE), and Sustained Lunar Evolution (SLR).
  • The program’s initial missions will require enhanced transport capabilities for crew and cargo.
  • The lunar surface presents unique challenges, including regolith, lighting conditions, and terrain.
  • Autonomous and teleoperated systems will be vital for mobility on the Moon.
  • Energy and environmental considerations are crucial for the design of lunar transport systems.
  • Future mobility systems will need to be interoperable and capable of autonomous operation.
  • NASA will address these requirements in the 2024 Architecture Concept Review (2024 ACR).

Artemis Program: Why a Moon Base Will Need a Transport System

NASA’s Artemis Program will send astronauts back to the Moon. The last visit was Apollo 17 in 1972. The next mission is planned for September 2026. NASA will then build the systems needed for yearly trips to the Moon. This will lead to humans living there permanently. There will be a big need for cargo delivery systems. These systems must help with the needs of the crews. They must support their exploration with the right logistical, scientific, and technical support.

We need transportation systems not just for delivering crews and cargo. They must also handle logistical needs and help exploration efforts. These needs were described in a 2024 Moon to Mars Architecture white paper. The paper is titled “Lunar Mobility Drivers and Needs.”

It follows another paper called “Lunar Surface Cargo.” This new white paper talks about the need for lunar infrastructure. Such infrastructure will help move astronauts and payloads from landing sites to important locations. As usual, they found a big gap between what we can currently do and what we expect to need.

The authors again stress the need for mobility systems. These systems should align with NASA’s goals. These goals are outlined in the Moon to Mars Architecture Definition Document (ADD). The authors say recent studies show something important. We need transport systems on the lunar surface. These systems should move cargo from delivery points to usage points. This cargo can include crew supplies, scientific demonstrations, and large infrastructure that needs precise moving.

In short, in addition to landers capable of delivering crews, supplies, experiments, and habitats, NASA’s Moon to Mars program also requires vehicles and support networks that can deliver them from point A to point B. As they state, the currently defined mobility elements are either primarily for crew use or are limited in mobility. This includes elements like the Lunar Terrain Vehicle (LTV) and the Pressurized Rover (PR) – which are elements of the Artemis Base Camp – and robotic missions contracted through the Commercial Lunar Payload Services (CLPS) program.

In addition, the needs and challenges that will emerge as the Artemis Program unfolds are broken down into three segments: Human Lunar Return (HLR), Foundational Exploration (FE), and Sustained Lunar Evolution (SLR). The HLR segment includes the Artemis III mission, currently scheduled for September 2026, where a crew of two will land on the lunar surface using a Starship HLS. The FE segment will coincide with Artemis IV and Artemis V (2028 and 2030), where crew sizes will expand from two to four, and the necessary infrastructure will expand.

After that, during the SLR segment, NASA plans to mount a mission a year and establish a permanent lunar habitat. Throughout this period, the demands for payloads and transportation systems will exceed current capabilities, limited to 15,000 kg (33,070 lbs) of cargo. Similar to what NASA related in their Lunar Surface Cargo whitepaper, accomplishing key mission objectives will require cargo of sizes and masses beyond these capabilities, creating the need for additional solutions.

Mobility demand forecast shows how much transportation will be needed in the future. LTV stands for Lunar Terrain Vehicle. LRV stands for Lunar Roving Vehicle. These are types of transport vehicles used on the moon. NASA compared how well LTV and LRV could meet the future transportation needs.
Mobility demand forecast shows how much transportation will be needed in the future. LTV stands for Lunar Terrain Vehicle. LRV stands for Lunar Roving Vehicle. These are types of transport vehicles used on the moon. NASA compared how well LTV and LRV could meet the future transportation needs.

Isolation and Movement

As the authors state, a major issue on the lunar surface affecting mobility is the need for separation between landing sites and points of use. This separation is motivated by several factors, including science objectives, lighting conditions, and safety considerations. In short, crew vehicles, habitats, and key infrastructure will be positioned at a distance from landing sites so as not to be affected by darkness caused by the landers’ shadow, contamination by the landers, and regolith or blast ejecta created by engine plumes. Based on the level of concern, separation distances are broken down into three tiers:

  • Separation from lander shadowing: tens of meters (tens of yards)
  • Lander blast ejecta constraints: due either to separation between the lander and existing infrastructure or lander ascent (>1,000 m; ~1090 yards)
  • Support for aggregation of elements in ideal habitation zones from available regional landing areas: up to 5,000 m (~5470 yards)

NASA’s Moon to Mars mission architecture emphasizes the need for In-Situ Resource Utilization (ISRU), such as water ice, regolith, and minerals. NASA also recognizes the need to select habitation and hibernation sites that minimize the exposure to darkness from shadows caused by the local topography and the inclination of the Sun during lunar nights (which last two weeks at a time). This is easiest at higher elevations and on top of crater ridges. This necessitates two things:

  1. Exploration, habitation, and power sites will need to be located far from landing and ISRU sites.
  2. Traverses from landing to habitation zones could encounter slopes of up to 20 degrees.

As the authors state, these overlapping challenges can be met by ensuring systems are in place so mission elements can move away from landers once they are deployed on the surface:

“This could be done using independent or integrated mobility systems. The frequency of traverses between downslope and upslope locations would be driven by the cadence with which landers deliver cargo to the lunar surface and the mass that a given mobility system can carry on each traversal. Integrated architecture operations will necessitate non-trivial relocation and aggregation ranges for cargo and assets.”

Transportation Abilities

During the FE segment of the Artemis Program, NASA plans to expand surface crews from two to four, which will need to operate on the surface for about 30 days. This will require a wide range of mobility needs that can accommodate payloads of varying size and mass and over a range of distances. These include:

  • Smaller technology demonstrations: 500 to 2000 kg (~1100 to 4410 lbs)
  • Logistic Elements per crewed surface mission: 2,000 to 6,000 kg (~4410 to 13,230 lbs)
  • Habitation Systems: 12,000 to 15,000 kg (~26455 to 33,070 lbs)

The authors acknowledge that current mobility elements could provide some cargo relocation capabilities – the LTV, for example, can accommodate 800 kg (~1764 lbs) of cargo when uncrewed. However, according to the NASA team’s analysis, the mobility capacity falls short of demand by 1,000 to 15,000 kg (2,200 to 33,070 lbs) per asset for ranges of 50 to 5,000 m (~55 to 5470 yards). Moreover, the “frequency of relocation needs” (i.e., how often payloads need to be moved) will vary considerably, ranging from single operations for large elements to multiple trips a year for containers and smaller cargo.

Environments

The authors also address how lunar conditions are important when developing mobility systems. One of the greatest hazards on the Moon is regolith (aka. “moondust”), the fine silicate powder that covers much of the surface and sticks to everything it comes into contact with. There are lighting conditions where parts of the South Pole region will be shadowed due to the inclination of the Sun and permanently shadowed regions (PSRs) that experience perpetual darkness. Last is the matter of the terrain, which can be rocky or covered by 1 to 10 m (3.3 to 33 ft) of regolith and where slopes of more than 10 degrees are common.

This combination of factors, they argue, “creates a significant technological gap between existing systems and mobility demands for future exploration.” For starters, energy systems must provide enough power so vehicles can maintain sufficient speeds and carrying capacity and can operate during lunar nights. The authors also recommend conducting more studies on regolith mitigation strategies to prevent wear and tear and the effects regolith could have on electro-mechanical systems. They also stress the need for sufficient autonomy and/or teleoperation, allowing greater flexibility and range.

These autonomous systems must contend with the challenging lunar terrain, map the local topography, recognize obstacles and unpassable regions, and identify optimal pathways to reach their destinations. As the authors note, these systems could offer increased flexibility for mission planning and increase the speed of mobile assets, especially in areas where the terrain interferes with communications and makes remote operations impossible.

Artemis Program Why a Moon Base Will Need a Transport System
Artemis Program Why a Moon Base Will Need a Transport System

Energy and Environmental Demands

The white paper also addresses energy and environmental considerations. As noted already, lunar nights are two weeks long, which poses significant challenges for exploration and habitation. Currently, NASA’s Moon to Mars architecture does not specify how the base camps will be powered, though solar power is considered a safe bet. However, the team notes that generating sufficient power to accommodate lunar operations will require solar power systems with “surface mobility capabilities.”

They also note that lunar mobility systems will need to operate for 12 hours a day for up to 30 days and that proposed systems will need to deliver sufficient power to operate for six to twelve months. The thermal environments are also a serious consideration, with average daytime temperatures reaching 120 °C (248 °F) and nighttime temperatures going down to -170 °C (-274 °F). This creates issues for systems that are required to operate day and night.

Conclusion

NASA sees the need for flexible mobility systems. These systems will help astronauts and cargo move across the lunar surface. The systems must meet the needs of the Artemis Program. HLR, FE, and SLR segments define these needs. Current systems handle some mobility needs, but there is a gap. Future missions will need more advanced capabilities. The 2024 Architecture Concept Review (2024 ACR) will focus on these needs.

NASA aims to develop new mobile assets. These assets must work together smoothly and operate on their own without constant human control. The Artemis Program will rely on these assets for its first lunar missions in 2026. This includes delivering infrastructure and crew missions in the late 2020s. By the 2030s, NASA wants to have a lasting presence on the Moon. Closing these technology gaps will help astronauts explore and do science on the Moon.

Tables

Mission Segment Crew Size Duration Infrastructure Needs
Human Lunar Return (HLR) 2 1-2 weeks Initial landing and exploration infrastructure
Foundational Exploration (FE) 4 30 days Expanded habitats, power systems, mobility solutions
Sustained Lunar Evolution (SLR) 4+ Indefinite Permanent habitats, ISRU systems, advanced mobility
Mobility Demand Payload Mass Range Traversal Distance
Small technology demos 500-2000 kg Up to 5000 m
Logistics per mission 2000-6000 kg Up to 5000 m
Habitation systems 12000-15000 kg Up to 5000 m

References

Hashtags:

#ArtemisProgram, #NASA, #MoonBase, #LunarExploration, #SpaceTravel, #SpaceTechnology, #MoonMission, #SpaceExploration, #SpaceScience, #MoonSurface, #MoonTransport, #SpaceTech, #HumanSpaceflight, #Astrobiology, #LunarBase, #ExplorationMission, #MoonToMars, #SpaceColonization, @NASA, @NASAArtemis, @NASAMoon, @NASA_Technology, @SpaceX, @BlueOrigin, @BoeingSpace, @LockheedMartin, @Space_Station, @ISS_Research
Pin It
error: Content is protected !!

On this website we use first or third-party tools that store small files (<i>cookie</i>) on your device. Cookies are normally used to allow the site to run properly (<i>technical cookies</i>), to generate navigation usage reports (<i>statistics cookies</i>) and to suitable advertise our services/products (<i>profiling cookies</i>). We can directly use technical cookies, but <u>you have the right to choose whether or not to enable statistical and profiling cookies</u>. <b>Enabling these cookies, you help us to offer you a better experience</b>.